Backup power supply system for Carlsberg Ukraine

Backup power supply system for Carlsberg Ukraine

As part of the modernization of the energy infrastructure of Carlsberg Ukraine, a project was implemented to introduce a modern backup power supply system based on the Dalgakiran DJ1500NG gas piston unit.

Selection of equipment

During the feasibility study, the client decided on the Dalgakiran DJ1500NG solution, equipped with an MTU Rolls-Royce gas engine. This is a highly efficient gas-piston unit that is ideally suited for backup power applications at industrial facilities. The equipment was delivered in December 2024.

A range of services from Dalgakiran

Dalgakiran Compressor Ukraine LLC undertook the entire range of works:

  • technical support for the selection of equipment,
  • delivery within the agreed time frame,
  • commissioning works at the facility,
  • support for commissioning.

Everything was done in strict accordance with the contractual terms and technical requirements. Based on the results of testing and operation, the equipment confirmed its compliance with the declared characteristics and high quality standards adopted by Carlsberg Ukraine.

The result of cooperation

During the project implementation, Dalgakiran Compressor Ukraine LLC proved to be a responsible, reliable and technically competent partner. “We have no comments on the work of the company or the equipment supplied. We can recommend Dalgakiran Compressor Ukraine LLC as a reliable supplier for energy supply projects,” said Carlsberg Ukraine representatives.

Project manager: Oleksandr Popov